Warmington says bridges and breakaways in South West St Ann to receive immediate repairs
Road breakaways and defective bridges in the South West St. Ann Constituency, are to be repaired immediately.
The assurance was given by Works Minister Everald Warmington, while on a tour of the constituency, on Wednesday.
He indicated that the overall condition, of roadways in the constituency, is good, but there are several breakaways.
He expressed concern about the state of the brown’s town to alexandria main road.
0 Comments